Operating data of the mountain railways
From 1 May we start the summer season. The operating dates & opening hours for the summer can be found in the following document.
Gstaad
Aerial cable car
Gondola lift
-
Mo - Su:
- 09:00 am - 04:30 pm
Gondola lift
Triple chairlift
-
Mo - Su:
- 09:00 am - 04:30 pm
Chairlift - 4 people
Gondola lift
Gondola lift
Gondola lift
-
Mo - Su:
- 09:00 am - 04:30 pm
Glacier 3000
Aerial cable car
Cable car Cabane - Scex Rouge
2. section (125 pax)
Aerial cable car
Cable car Pillon - Cabane
1. section (125 pax)
Special features: The imposing station on the Col du Pillon - designed by the Swiss star architect Mario Botta - is the starting point for the glacier trip. Thanks to two cable cars, you can climb up to 1500 meters in only 15 minutes.
Chairlift - 4 people
Chairlift - 4 people
Aerial cable car
- 4 km/h (South south east)
- 22 km/h
- 6 km/h (South east)
- 26 km/h
- 0.7 mm
- 4 km/h (South south east)
- 28 km/h